7202ENG Project Evaluation and Control – Sydney Metro
Total Views 707
Table of Content
- Introduction
- Project Appraisal
- Conceptual Design
- Contract Strategy
- Project Finance Option
- Develop Project Estimate
- Project Cash Flow Projection
- Risk Management & Environment
- Profitability Analysis
- Conclusion
- Reference
- Figure 1: Sydney Metro
- Figure 2: Transport Component Model of NSW
- Figure 3: Sustainability Journey
- Figure 4: Cash Breakdown
Introduction
This assignment is based on the project evaluation and control which use to explain and define the complete description and working functionality of a real-world project. The project can be government and non-government also but should exist in the real world. The project which is selected for this assignment is based on the Sydney Metro. In this assignment report, every possible information about the Sydney metro will be defined and explain. The Sydney metro is one of the biggest megaprojects in the transportation sector and there are several implementation and other aspects that are also available. In this major report, multiple aspects of the Sydney metro will be evaluated and analyzed. Sydney Metro is Australia’s biggest public transport project in every city of Australia this project has been developed and developing.

Figure 1: Sydney Metro
The reason behind the selection of this project is to evaluate and identify the requirement and the construction process of this project. This project is Australia’s biggest costly project in the transportation sector and the maintenance of this project every year a lot of amounts used to be invest. The previous PowerPoint presentation of this assignment has included the cost construction, project planning, cost breakdown, metro lines, and many more. The construction process and the method of the Sydney metro is one of the best transportation methodologies in all over the world and the quite biggest metro line also.
The facility provided in the Sydney metro and the metro stations is very effective and efficient. In Australia, there are 31 metro stations and these 31 metro stations connect every single city of New South Wales (NSW). The government of the NSW has adopted driverless metro operations on May 26 and the extension of this metro operation will open in 2024. The technological aspect of the Sydney metro has an impact and very impressive functionality also. The technology will keep the customers too connected to each other and this will become an impressive aspect and feature. The technological aspect and implementation will be defined in this report. At the end of this report, everything about this Sydney metro will be defined and explain. The advantages and the challenges of this Sydney metro including the cost construction, feasibility, breakdown structure, and many more will also be defined and evaluated in this assignment report.
Project Appraisal
As defined that Sydney Metro is Australia’s biggest transportation project and 31 metro stations are there and more than 65 kilometers of new metro rail line infrastructure and this metro rail line infrastructure is revolutionizing the city travels in Australia. The metro rail line is very important nowadays in the biggest countries. The importance of using the metro line is that the metro rail is one of the most secure transportation ways and give the world-class facility also. The people connection process has been evolved by using the metro lines. One of the biggest advantages of the metro rail lines is that this not include a proper time table for traveling. There are back to back metro services are available that provides the high reliability and performance to the customers and passengers. Nowadays there are many big countries are there who are using metro rail lines such as the US, America, India, China, and many more. Many cities in this country are using the metro rail line. People use to take the metro for their daily routine work like for office and many more. Because by using the metro line they can save their time by avoiding stuck in the traffic and the server of the metro rail is very fast (Berger N, 2019).
The Sydney metro proves the metro rail service in every four minutes during the peak. The first metro project in Sydney was Sydney metro northwest. Now, this northwest project has been successfully developed and advanced and multiple features and the functionalities are there in this metro route line. The northwest is the first stage of the Sydney metro project and in the completion of the year 2019, this project has become more advanced and fully developed. There are several aspects are there are every single approach is directly or indirectly associated with each other. The tunneling and the bridging is the main component of this phase that should be directly related to the metro rail line aspect. The second stage of the Sydney metro line is of the southwest city route and this route is now well advanced. In the implementation of the Sydney metro the automated rapid transit system has been developed and implemented in this phase. In the completion of the 2024 year, the Sydney metro will be the first dedicated rapid transit line in Sydney. The network capacity in the implementation and the completion of the Sydney metro has been increased by 60% and this increased functionality is creating 100000 additional space for the passengers an hour during peak times.
The first stage of the Sydney metro project uses to connect Sydney’s north-western complete route. The line of this route is still under construction and much more technological-based functionality will be implemented and execute in this aspect (Berger N, 2019).
Environmental Effect:
In the transportation business filed the environment is also one of the most important aspects and sectors which includes the environmental planning and assessment ACT 1979 (NSW). In the implementation of the environmental impact, there are some process are available such as:
- Aboriginal heritage
- Transport and traffic
- Business impact
- Social impact and community infrastructure
- Risk and hazard management, etc.
Cost-effective management is also included in the environmental factor with a contract period. Balancing environmental and economic objectives in developing countries and cities required a land management strategy and facilitates marketing effects. Australia is having the fully automated metro project and this is scheduled for the 2019 development phase and multiple aspects are there which are associated with each other.
Conceptual Design
In the year 2024 Sydney metro will get the extension of the central business district (CBD) and this includes several of another implementation process of southwest and north West. Sydney Metro Northwest, which is the main phase of the Sydney Metro venture, is as of now all around cutting edge and due for culmination in the principal half of 2019. Burrowing is finished, with spans and common functions admirably progressed. The 8 new railroad stations, track work, and so on are fundamentally in the structure stage.
Anticipating Stage 2 of the Metro Project, i.e. Sydney Metro City and Southwest is currently all-around cutting edge, and Tim will give an outline of a portion of the specialized and business parts of this procedure. On the specialized side, Tim will dive into, among different angles, subtleties on structure, security confirmation, and hazard appraisal and moderation. This will cover, arrangement geometry and effects, under Harbor crossing contemplations, including solid linings and waterproofing (Richardson N, 2019). Tim will likewise give bits of knowledge on business viewpoints, for example, the agreement technique, and the extent of works and specialized standards (SWTC).

Figure 2: Transport Component Model of NSW
Innovation will keep clients associated during all phases of their excursion:
- Preparation at home applying progressive mobile phone travel requests
- Real-time undertaking data at metro stations and on the panel makes
- Retrieving statistics of other open automobile styles to help with attainment to their last box after they permission the metro rail route.
This methodology will assist clients with accomplishing their everyday travel errands, in a proficient way Malcolm will give an outline of the Operations Trains and Systems (OTS) PPP contract, including consortium individuals, and the expansiveness of degree and program for conveyance. He will likewise report on the development and assembling progress to date. He will feature key venture building highlights and framework wide difficulties just as NRT’s answers and advancements inserted into the structure improvement for the new stations, frameworks, and metro trains.
NRT is a client-centered and administrator drove consortium that will acquaint with Australia the advantages of demonstrated metro administrations and advances from around the globe. Malcolm will feature the main client center standards for metro administrations to improve the security and unwavering quality execution, administration recurrence, in train venture client experience, and station openness and reconciliation. The Sydney Metro administration will have the ability to work concentrated administrations (up to 25 trains for each hour in either course – or more for future expansions), utilizing the correspondence based train control (CBTC) innovation. CBTC is the establishment of completely mechanized train tasks. Malcolm will likewise talk about the structure and frameworks building approach, flagging, and train control, just as interchanges and passageway security (Richardson N, 2019).
Contract Strategy
There are 8 new railway stations and 4000 traveler parking planetary are available in Sydney’s growing North West. In the completion of the project, one of the biggest issues is contract strategy. The contract strategy selection process should be very effective and suitable for the project. The contract strategy uses to explain the project objective clearly. The contract strategy is applied to select an appropriate administrative structure and prescribed structure also. The complete availability of the contract strategy includes the management and the construction based implementation process. There are some key qualities are available of contract strategy such as:
- Project purposes and restrictions
- Choosing an actual project distribution technique
- Choosing a correct agreement
- Agreement management training
A contract strategy is an agreement between two parties and numerous aspects are available and associated with each other. In the process of the contract strategy, there are several components are available such as:
- Competent Parties
- Consideration
- Agreement
- Proper Subject Matter (Maxwell K, 2019)
Sustainability of Sydney Metro:
Sustainability supports center task targets of Sydney Metro and is coordinated overall activities. Inserting supportability necessities into agreements over the task lifespan has been critical to Sydney Metro’s accomplishment in creating and actualizing best practice guidelines. Sydney Metro mechanism with Major Servicers to assurance the fruitful conveyance and usage of maintainability gauges, boards, and activities. Task explicit supportability procedures give a system to successful administration and react to the Sydney Metro Atmosphere and maintainability Policy. The Sydney Metro City and Southwest maintainability Strategy is freely accessible.
Maintainability execution on Sydney Metro ventures is selected against boards set in venture manageability procedures. Outsider confirmation rating devices are additionally used to gauge and screen manageability execution. Head Servicers are obligatory to provide details regarding their presentation to Sydney Metro on a month to month premise. This information is gathered and answered to the Sydney Metro official. This methodology gives a vigorous structure to evaluate the execution of expectations and grips Sydney Metro and its Major servicers responsible for conference natural and communal supportability prerequisites (Driver B, 2019).

Figure 3: Sustainability Journey
In anticipation of its first traveler administrations Sydney Metro is:
- Completing takes a shot at station areas, vehicle leaves, and other supporting foundation
- Working with the working accomplice to guarantee everything is prepared for the very beginning of activities
- Working with other vehicle organizations and nearby boards to coordinate metro administration into the more extensive vehicle arrange
- Upgrading the current rural line among Epping and Chats-wood to metro norms
- Employed with the network, business, and administration to save clients moving while we update the Epping to Chats-wood rail connect.
Sydney Metro and Landform went into a consent to convey the new regions about the positions among Tallawong and Epping stations. The two associations are cooperating to set maintainability norms for these new areas that will limit natural effect while augmenting social advantages for the network and client (Maxwell K, 2019).
Project Finance Option
In the process of the next stage, the finance option will be analyzed. The Government of New South Wales (NSW) has concluded open private association contracts with the Northwest Rapid Transit (NRT) consortium to expand the Sydney Metro rail venture in Australia. The NRT consortium involves MTR Corporation, John Holland, CPB Contractors, UGL Rail, and Plenary Group. The A$3.7bn ($2.5bn) expansion contract, which structures some portion of the following phase of the Sydney Metro venture, includes A$1.7bn ($1.15bn) for new metro prepares and center rail frameworks.
Also, the agreement incorporates A$2bn ($1.3bn) for tasks and support of the consolidated North West and City and Southwest lines until 2034. Entire, filling in as the consortium’s primary business counsel, speculator, and monetary arranger has worked nearby venture lead MTR to finish plans required for the augmentation to their current PPP contract. The consortium at first marked the agreement with the New South Wales government in 2014 for the main period of the Sydney Metro venture. The venture entered administration not long ago. By coordinating the Sydney Metro City and Southwest venture with the as of late opened Metro North West line, the PPP will presently convey a 66km line including 31 stations from Tallawong to Bankstown.
Entire CEO Paul Oppenheim said that the Plenary and MTR groups had been taking a shot at the multi-stage process for over three years to convey sureness and worth for-cash to the State of New South Wales. Oppenheim included it was a procedure that requested early concurrence on the specialized and business structures, setting up a fixed cost and itemized terms for the expansion. The control required to accomplish a fixed agreement cost is a result all gatherings can be extremely pleased within the present atmosphere of value heightening. This is additionally an extraordinary commercial for the adaptability of PPPs (Torres T, 2019).
As a major aspect of the extended undertaking, the consortium will be liable for the combination of the current Metro-North West, and the metro rail change of the Sydenham to Banks town rural line. For the expansion venture, MTR will configuration, incorporate, and convey the bundle, which will be bolstered by Alstom for trains and flagging; Thales for interchanges; UGL for radio; and Gilgen for stage screen entryways. Entire and MTR are working nearby the NSW Government’s Sydney Metro position to finish subtleties of the agreement and accomplish monetary close, which is planned for the not so distant future.
As a head business specialist, theorist, and cash related arranger for the comprehensive open private affiliation (PPP) contract, Plenary has renegotiated the Sydney Metro Northwest PPP and raised new commitment and incentive to back the Sydney Metro City and Southwest PPP. Bank commitment is being given by driving family unit and overall banks ANZ, Credit Agricola CIB, HSBC, ING, Intisar Sangallo, KFW, Mizuho, MUFG, NAB, OCBC, SMTB, UOB, and Westpac. Worth financing begins from MTR (27.55%), Cuisse de stops ET circumstance du Québec (24.9%), Marubeni (20%), Plenary (17.55%) and Pacific Partnerships (10%).
As an element of an attracted out duty to the accomplishment of Sydney Metro both Plenary and MTR have extended their endeavor. Besides, the hypothesis qualities of the assignment have been seen with one of the world’s greatest establishment money related pros in CDPQ joining the examiner gathering. The whole CEO Paul Oppenheim said having the choice to achieve budgetary close on the City and Southwest extension while renegotiating the present Northwest PPP all the while was an immense outcome that passed on sureness and motivating force to the organization. This course of action is an exceptional business for the versatility of PPPs, Mr. Oppenheim said.
The heavenly financing outcome has given a renegotiating increment to the State and shows the fundamental quality the private zone finds in the Sydney Metro adventure. A solid and controlled effort was required by Plenary and the whole NRT consortium to satisfy the New South Wales Government and achieve this colossal worth for-money result (Torres T, 2019).
Develop Project Estimate
The defender’s changed monetary assessment shows the task has an advantage cost proportion (BCR) of 1.3 dependent on traditional vehicle benefits, barring more extensive financial advantages (7% genuine markdown rate and P50 costs). Counting more extensive financial advantages and ‘city molding’ benefits, the BCR increments to 1.7. More extensive monetary advantages are business profitability benefits city-forming benefits remember the expansion for the estimation of customary vehicle benefits because of progress in land use, the expansion in profitability because of progress in land use, and cost investment funds because of progressively productive land use. The overhauled monetary examination was created in light of issues that Infrastructure Australia distinguished in the first business case.
One issue was the utilization of extension factors, which are utilized to elevate projections for the 3.5-hour morning top into an entire day figure. For the period up to 2036, the 2016 financial investigation applied a development factor of 3.03, reliable with NSW direction (3.04). Be that as it may, from 2036, an extension factor of 5.2 was utilized. The advocate showed this reflected discoveries from significant urban areas abroad on the usage of metro systems during off-top periods. Foundation Australia noticed that metro organizes in these urban communities have been working for a long time, and system inclusion over these urban communities is essentially broader than in Sydney. Additionally, populace thickness in comparator urban areas is altogether higher than Sydney’s, which would affect the use of the rail organize. The May 2017 amended financial examination utilized the standard NSW extension factor of 3.04 for the whole evaluation time frame, which marginally diminished the venture’s BCR (Newton S, 2019).
A subsequent issue was the Reference Case, which incorporates the proposed Western Harbor Tunnel in 2036. This venture isn’t as of now supported. The defender has proposed that remembering this plan for the Reference Case is a preservationist approach, as it will probably diminish interest for an open vehicle in the passage. While this methodology is helpful for coordinated long haul transport arrangements, it isn’t fitting for money saving advantage investigation. The May 2017 reexamined financial examination didn’t address this issue. Changing the Reference Case to avoid the proposed Western Harbor Tunnel would probably expand the task’s BCR.
Framework Australia additionally distinguished various components that could emphatically effect on the monetary reasonability of the venture, including:
- Annualization Factors: The sponsor applied an annualization inspire of 288 days, lower than the NSW standard of 300 (for rail ventures). In the reconsidered monetary investigation the defender applied the standard NSW annualization factor
- Network Resilience: the venture gives another rail burrow interfacing the north of Sydney with the CBD, giving an elective harbor crossing. This will expand the versatility of Sydney’s vehicle to organize. While the defender has considered system versatility benefits in the business case, these effects have not been measured in the financial assessment
- Appraisal Period: The defender has adhered to the standard direction of utilizing a 30-year examination period. Be that as it may, the task incorporates resources, for example, the passage, which is probably going to have any longer valuable life. It is fitting to in this way receive a 50-year examination period, as per the Australian Transport Assessment and Planning rules. This would have a noteworthy and positive effect on the BCR.
The edited monetary examination additionally balanced the strategy used to gauge city molding benefits, to incorporate vehicle segments in the traditional vehicle benefits. The advocate evaluated the more extensive monetary advantages (WEBs) on the premise that the undertaking would furnish laborers with quicker and more straightforward access to the CBD and would upgrade network between organizations along Sydney’s Global Economic Corridor, bringing about expanded business efficiency and the formation of all the more high-esteem occupations. While Infrastructure Australia perceives the vital value of the undertaking and its capability to create noteworthy WEBs, the technique supporting the evaluation of WEBs in Australia is still a work in progress. In like manner, the incorporation of city molding benefits isn’t standard practice in transport money-saving advantage investigation in Australia. Hence, the BCR including WEBs and city-forming benefits is cited independently to the BCR dependent on ordinary vehicle benefits (Newton S, 2019).
Project Cash Flow Projection
The cash flow is one of the most effective and very important aspects of the implementation and development of any phase of big project construction. The Sydney Metro project is Australia’s biggest transport based project and the cash requirement of this project is very high. The cost breakdown structure of this Sydney metro development is given below:

Figure 4: Cash Breakdown
The given image is about the cash breakdown and there are some of the aspects that are given such as public transport user benefits, read user benefits, other societal benefits, land use transport impact, the residual value of assets, and many more. These all are some components of transport benefits are available that are associated with each other.
Risk Management & Environment
Hazard the executive at Sydney Metro is a critical piece of hierarchical administration. It drives business execution and conveyance of venture targets securely and effectively. We are focused on constant improvement in chance administration, and to assemble a hazard mindful culture to help our undertakings and operative achievement.
Risk management is connected in business arranging, venture advancement, and the board forms. Sydney Metro applies an endeavor wide organized and responsible way to deal with guarantee dangers are proactively recognized and properly relieved. Dangers and alleviations are routinely evaluated and answered to the Sydney Metro Board. Sydney Metro’s hazard the board is dependent upon a mistake by an audit and risk commission led by an autonomous non-official Chair. Sydney Metro acquires conveyance protections for our tasks from the business protection advert. This incorporates the accompanying protections:
- Contract works: physical misfortune or harm to the works
- Delay in fire up the loss of income following a deferral to finish emerging from insurable harm
- Open obligation: lawful risk to outsiders for individual injury or property harm emerging out of the works (Gibson C, 2019).
Activities Phase protections are secured by NRT. These protections incorporate property harm, open risk, and expert reimbursement protection, which spread Sydney Metro for our insurable advantages where appropriate. Notices of cases made by contractual workers and administrators are acknowledged by safety net providers as a warning by Sydney Metro. Contractual workers and administrators manage back up plans and misfortune agents and are compulsory to keep Sydney Metro refined regarding all turns of events. Sydney Metro likewise utilizes the NSW Treasury Managed Fund for our immediate protection necessities counting property harm, laborers’ pay, open obligation, and incidental things. In 2018–19 there were no material cases made against any of these protected classes under the NSW Treasury Managed Fund.
Profitability Analysis
In the implementation of profitability analysis, there are several aspects are there such as customer benefit analysis, cost-benefit analysis, and many more.
Customer Benefits:
There is no time table for the journey and customers just need to come and turn up and go. Sydney Metro works intimately with partners over the NSW and Australian Governments to create and convey our program of work. We plan to grow long haul associations with an assortment of accomplice organizations in the Transport group and others that have an enthusiasm for the conveyance and advantages of Sydney Metro.
During 2018-19, key exercises attempted by Sydney Metro with government office accomplices incorporated a critical cross-bunch community oriented exertion to bring the Sydney Metro North West Line into administration. Sydney Metro likewise embraced continuous joint advancement work with Transport for NSW divisions and different offices including the Greater Sydney Commission and the new Department of Planning, Industry, and Environment on the degree, structure, and conveyance getting ready for future metro ventures. Sydney Metro builds up cross-government controlling advisory groups and different gatherings as required to guarantee venture advancement assesses accomplice office necessities and advantages from their info. The Sydney Metro Greater West venture is being created by Sydney Metro in association with the Australian Government Department of Infrastructure, Transport, Cities and Regional Development, and as a team with other Australian Government and NSW government offices (counting Transport for NSW), and neighborhood government (Chen Y, 2019).
We perceive the critical pretended by industry in conveying the metro program of work, and keep up a broad program of industry commitment exercises to furnish industry members with data on the Sydney Metro ventures, and to pick up industry contribution on venture degree, timing and contracting courses of action. In 2018-19 the business commitment program incorporated instructions went to by more than 550 members, just as market sounding gatherings and different exercises for the Sydney Metro West and Sydney Metro Greater West tasks.
Sydney Metro has a Workforce Development and Industry Participation Plan and Aboriginal Participation Plan which both framework how Sydney Metro’s ventures manufacture a pipeline of assets to configuration, build and work the railroad, and address difficulties identifying with abilities, business, and decent variety over the flexible chain. The Sydney Metro City and Southwest venture is a show pilot venture for the NSW Infrastructure Skills Legacy Program. Over the City and Southwest undertaking, 44 percent of the workforce has taken an interest in licensed aptitudes improvement, and 224 understudies and learners have chipped away at the venture. Sydney Metro’s pre-work program accomplished 98 percent effective fruitions with 44 members being utilized on Sydney Metro. In general 43 members have proceeded onto an apprenticeship or learner pathway (Graham D, 2019).
To be viable the vehicle framework must address client issues. Transport for NSW is answerable for guaranteeing the requirements of the client are at the focal point of arranging and dynamic for the vehicle framework, and that all tasks and administrations are structured and worked in like manner. This is reflected in the TFNSW statement of purpose: “The client is at the focal point of all that we do in transport.” Customer experience will be a central driver for the Project. The stations prepare and complete travel experience will be vital to the client experience. A top-notch entryway to entryway transport item is basic to drawing in and holding clients, and to meeting more extensive vehicle objectives.
Clients are at the focal point of Sydney Metro. Australia’s greatest open vehicle venture will convey a simple way to-entryway experience, incorporating Sydney’s new-age metro trains with cutting edge stations and 21st-century innovation. Sydney Metro will make it simple for clients to get where they have to go. New metro administrations will be coordinated with other vehicle modes, incorporating trades with the current Sydney railroad arrange just as transports, light rail, and ships. Clients are at the focal point of Sydney Metro’s 21st-century configuration, including the advancement of Sydney’s new metro train, new metro railroad stations, exchanges, and areas. Cutting edge innovation will keep clients associated at all phases of their excursion, from advanced mobile phone travel applications while in transit to stations to continuous excursion data at metro stations and onboard prepares. This methodology will assist clients with accomplishing their day by day undertakings all the more effectively, regardless of whether it’s getting the opportunity to work, gatherings, school or instruction, sport, a day out or getting things done – and, returning home (Anderson RJ, 2019). Making it simple for clients at each phase of their excursion will be fundamental in the fruitful conveyance of Sydney Metro. Connecting people group, schools, medical clinics, key goals, and organizations with the new metro railroad arrange is key in drawing in and keeping clients, just as in meeting more extensive vehicle and land use targets. Transport for NSW is working across government and with the network to get clients to and from new metro benefits effectively and, when going on them, to guarantee they are protected and agreeable. Sydney Metro is being intended to convey protected, spotless, agreeable administrations that will run on schedule, be advantageous, productive, available, and simple for clients to utilize.
Conclusion
This assignment was based on the mega project and the project was based on the Sydney metro. This was very difficult to evaluate because a lot of aspects were there in this project completion project that is directly or indirectly related to the construction industry based. In this report, numerous things are clearly defined and explained and somehow are associated with each other. The risk analysis of the Sydney metro station, the customer benefit analysis, cost-benefit structure, and many more aspects have been clearly defined in this report.
Reference List
Attard, C., Berger, N. and McDonald, P., 2019. Fast Tracking the Future Education Program: Sydney Metro Professional Development Project Evaluation.
Richardson, N., 2019. Wandering a Metro: Actor-Network Theory Research and Rapid Rail Infrastructure Communication. M/C Journal, 22(4).
Maxwell, K., 2019, April. Hickson Road arch bridges, Sydney-analysis for predicted ground movements. In Australian Small Bridges Conference, 9th, 2019, Surfers Paradise, Queensland, Australia.
Thalis, P. and Driver, B., 2019. Planning greater Sydney. Architecture Australia, 108(5), p.28.
Chen, Y., Yazdani, M., Mojtahedi, M. and Newton, S., 2019. The impact on neighbourhood residential property valuations of a newly proposed public transport project: The Sydney Northwest Metro case study. Transportation Research Interdisciplinary Perspectives, 3, p.100070.
Richardson, N., 2019. Wandering a Metro: Actor-Network Theory Research and Rapid Rail Infrastructure Communication. M/C Journal, 22(4).
Attard, C., Berger, N. and McDonald, P., 2019. Fast Tracking the Future Education Program: Sydney Metro Professional Development Project Evaluation.
Gharehbaghi, K., McManus, K. and Robson, K., 2019. Minimizing the environmental impacts of mega infrastructure projects. Journal of Engineering, Design and Technology.
Garcia-Hallett, J., Like, T., Torres, T. and Irazábal, C., 2019. Latinxs in the Kansas City Metro Area: Policing and Criminalization in Ethnic Enclaves. Journal of Planning Education and Research, p.0739456X19882749.
Chen, Y., Yazdani, M., Mojtahedi, M. and Newton, S., 2019. The impact on neighbourhood residential property valuations of a newly proposed public transport project: The Sydney Northwest Metro case study. Transportation Research Interdisciplinary Perspectives, 3, p.100070.
Gibson, C., 2019. Economic geography, to what ends? From privilege to progressive performances of expertise. Environment and Planning A: Economy and Space, 51(3), pp.805-813.
Singh, R., Graham, D.J. and Anderson, R.J., 2019. Characterizing Journey Time Performance on Urban Metro Systems under Varying Operating Conditions. Transportation Research Record, 2673(7), pp.516-528.
BookMyEssay is a leading name in academic writing service and provides help to students in making assignments of various subjects in many countries. In many courses, assignments carry a good proportion of marks that can significantly influence the final grades of the students. So, a good report writing service is extremely significant for students, and to write such high- quality assignments, BookMyEssay is the best call to make.